Essential Information
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Overview
Innovative Steel Formwork System
Our Steel Formwork offers unparalleled strength and durability, designed for extensive reuse in various construction projects. Easy to assemble and erect, it maintains a fixed shape and structure, making it ideal for high-rise buildings, roads, bridges, and any application requiring repeated use of same-shaped structures.
Packaging Details
1. The total net weight of a loaded container ranges from 22 to 25 tons, requiring confirmation before loading.
2. Various packaging methods are employed depending on the product:
---Bundles: For items like timber beams, steel props, and tie rods.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery Information
1. Production Time: For a full container, typically 20-30 days after receiving the customer's down payment.
2. Transportation Time: Varies with the destination port.
3. Special Requirements: Negotiable based on specific needs.
Frequently Asked Questions
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with two proprietary factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, construction firms, material suppliers, and trading companies.
C: We support global peers with top-quality formwork products.
Q4: How long does it take to create a basic design and quotation after receiving the structural drawings?
A: Typically, it takes
3
~7 days, depending on the project's specific requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, 30~60 days, depending on the type and quantity of products.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.