Essential Information
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Overview
Steel Formwork System
Crafted with exceptional strength and durability, our steel formwork is engineered for repeated use in various construction projects. The ease of assembly and erection makes it a top choice for high-rise buildings, roads, bridges, and any infrastructure requiring consistently shaped structures.
Packaging Details:
1. The total net weight per loaded container ranges between 22 to 25 tons, requiring confirmation before loading.
2. Tailored packaging solutions for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallets: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregular goods will be loaded in bulk within the container.
Delivery Information:
1. Production: Typically, a full container requires 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery times are dependent on the destination port.
3. Special requirements may necessitate further negotiation.
Frequently Asked Questions
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with our own two factories.
Q2: What services do you provide?
A: We specialize in the design and manufacturing of formwork products for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We offer support to our global peers with our high-quality formwork solutions.
Q4: How long does it take to provide a brief design and quotation once the structural drawing is received?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: What is the manufacturing timeline after contract signing?
A: Generally, it takes 30~60 days, based on the type and quantity of the products ordered.
Q6: What are your payment terms?
A: We require a 30% T/T advance, with the balance due before shipment.