Basic Information
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system boasts unparalleled strength and durability, allowing for multiple reuses in various construction projects. It's designed for easy assembly and erection, providing a fixed shape and structure that makes it ideal for projects requiring uniform structural elements, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed before loading.
2. Different products necessitate different packaging methods:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallets: Small parts are bagged and then placed on pallets for easy handling.
---Wooden Cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk inside the container.
Delivery:
1. Production: For a full container load, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: The transit time depends on the destination charge port.
3. Special requirements may be accommodated through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What is your primary business?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and quotations to owners, design institutes, and contractors involved in construction projects.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers with our high-quality formwork products.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.