• Floor Tile Construction Steel Formwork with Adjustable Height
  • Floor Tile Construction Steel Formwork with Adjustable Height
  • Floor Tile Construction Steel Formwork with Adjustable Height
  • Floor Tile Construction Steel Formwork with Adjustable Height
  • Floor Tile Construction Steel Formwork with Adjustable Height
  • Floor Tile Construction Steel Formwork with Adjustable Height

Floor Tile Construction Steel Formwork with Adjustable Height

After-sales Service: Yes
Warranty: One Year
Certification: ISO
Material: Steel
Type: Column Formwork
ODM or OEM: Yes
Customization:
Manufacturer/Factory
Diamond Member Since 2024

Suppliers with verified business licenses

Beijing, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (18)

Basic Info.

Model NO.
Column template
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System is engineered for exceptional strength and durability, making it an ideal choice for repeated use in various construction projects. Its ease of assembly and erection, combined with a fixed shape and structure, makes it perfect for applications requiring large quantities of uniform structures, such as high-rise buildings, roads, and bridges.
Floor Tile Construction Steel Formwork with Adjustable Height
Floor Tile Construction Steel Formwork with Adjustable Height
Floor Tile Construction Steel Formwork with Adjustable Height
Floor Tile Construction Steel Formwork with Adjustable Height
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, which must be confirmed prior to loading.
2. We utilize different packaging methods tailored to specific products:
---Bundles: Used for packaging timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then secured on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, the production timeline is typically 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time is dependent on the destination port.
3. Special requirements will be addressed through negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.

Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products forinfrastructure projects such as bridges and tunnels.

Q3: What can you provide for us?
A: We offer expert suggestions, detailed drawings of formwork layouts, and competitive quotations tailored for the owners, design institutes, or contractors involved in construction projects.
B: We sell our high-quality products to contractors, construction companies, material suppliers, and trading companies.
C: Our exceptional formwork products also support our peer companies across the globe.

Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, influenced by the type and quantity of products ordered.

Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Product Categories

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001