Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands as a testament to strength and durability, designed to be reused multiple times in various construction projects. Effortless to assemble and erect, its fixed shape and structure make it ideal for projects requiring large quantities of same-shaped structures, such as high-rise buildings, roads, bridges, and more.
Packaging:
1. The total net weight of a loaded container typically ranges between 22 to 25 tons, which must be confirmed prior to loading.
2. We use different packaging methods tailored to different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are secured in bags and then placed on pallets.
---Wooden cases: Available upon customer's request for specific items.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production Time: For a full container load, our standard production period is 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery times vary based on the charge port at the destination.
3. Special Requirements: Any unique requests will require further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a specialized stencil manufacturing company with two dedicated factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products tailored for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to construction project owners, design institutes, and contractors.
B: Our products are available for purchase by contractors, building companies, material suppliers, and trading companies.
C: We also supply our exceptional formwork products to peer companies globally, ensuring superior support.
Q4: How long does it take to prepare a basic design and quotation after receiving the structural drawing?
A: Typically, it takes
3
to 7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products after contract signing?
A: Generally, the manufacturing period ranges from 30 to 60 days, based on the type and quantity of products required.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.