Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Heavy-Duty Steel Formwork for Bridge Columns stands out for its exceptional strength and durability, making it perfect for repeated use across various construction projects. Its ease of assembly and fixed shape make it ideally suited for projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container generally ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. Different products require different packaging methods:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then secured on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery time varies depending on the destination port.
3. Special requirements will be addressed through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: How can you assist us?
A: We provide suggestions, formwork layout drawings, and quotations for construction project stakeholders such as owners, design institutes, or contractors.
B: We sell our products to contractors, building companies, material suppliers, and trading companies.
C: We supply our exceptional formwork products to our global peers.
Q4: How long does it take to create a preliminary design and quotation after we submit the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific construction project requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days based on the type and quantity of the products to be produced.
Q6: What are your terms of payment?
A: We require 30% T/T in advance with the balance due before shipment.