Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is an epitome of strength and durability, designed for extensive reuse across various construction projects. Its assembly and erection are streamlined, making it ideal for large-scale projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons. This must be verified prior to loading.
2. We utilize distinct packaging solutions tailored to different products:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are carefully bagged and placed on pallets for easy handling.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days post-receipt of the customer's down payment.
2. Transportation: The duration varies depending on the destination port's location.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a prestigious stencil manufacturing enterprise with two dedicated factories.
Q2: What services do you provide?
A: We specialize in the design and manufacture of formwork products essential for
construction of bridges and tunnels.
Q3: How can you assist us?
A: We provide expert recommendations, detailed formwork layout drawings, and comprehensive quotations to stakeholders, design institutes, and contractors involved in construction projects.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We support our international peers with our superior formwork products.
Q4: How long does it take to create a brief design and quotation once we provide the structural drawing?
A: Generally, it requires
3
~7 days, depending on the specific needs of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30 to 60 days, contingent on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: We require a 30% T/T advance, with the balance due before shipment.