Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands out for its remarkable strength and durability, making it an ideal choice for multiple reuses in construction. Easy to assemble and erect, this system is perfect for projects requiring a multitude of identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We use different packaging methods for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallets: Small parts are packed in bags and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Depends on the destination charge port.
3. Special requirements may require negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products specifically for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and accurate quotations to construction project owners, design institutes, or contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peer companies with our exceptional formwork products.
Q4: How long does it take to produce a preliminary design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of products required.
Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.