Steel Formwork Solution for Viaduct Concrete Forming

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Steel Formwork Solution for Viaduct Concrete Forming
  • Steel Formwork Solution for Viaduct Concrete Forming
  • Steel Formwork Solution for Viaduct Concrete Forming
  • Steel Formwork Solution for Viaduct Concrete Forming
  • Steel Formwork Solution for Viaduct Concrete Forming
  • Steel Formwork Solution for Viaduct Concrete Forming
Find Similar Products

Basic Info.

Model NO.
Column template
Certification
ISO
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork is renowned for its exceptional strength and durability, making it reusable time and time again in various construction projects. Its ease of assembly and erection, combined with its fixed shape and structure, make it ideal for large-scale applications requiring uniform structural shapes, such as high-rise buildings, roads, and bridges.
Steel Formwork Solution for Viaduct Concrete Forming
Steel Formwork Solution for Viaduct Concrete Forming
Steel Formwork Solution for Viaduct Concrete Forming
Steel Formwork Solution for Viaduct Concrete Forming
 

Packaging:

1. Typically, the net weight of a fully loaded container ranges from 22 to 25 tons. This needs to be confirmed before loading.
2. We utilize different packaging methods based on the type of product:
---Bundles: Used for items like timber beams, steel props, and tie rods.
---Pallet: Small parts are bagged and then placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk directly into the container.
Delivery:
1. Production: For a full container, production typically takes between 20 to 30 days after receiving the customer's down payment.
2. Transportation: Duration depends on the destination charge port.
3. Special requirements can be discussed and negotiated.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.

Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.

Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to the owners, design institutes, or contractors involved in construction projects.
B: We sell our premium products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork solutions.

Q4: How long does it take to produce a brief design and quotation after we provide the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, manufacturing takes 30 to 60 days based on the type and quantity of products required.

Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier