Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is engineered for strength and durability, ensuring it can be reused numerous times in construction projects. It offers ease of assembly and erection, making it the ideal choice for projects requiring a high volume of identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This needs to be confirmed before loading.
2. Various products require different packaging solutions:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallets: Small parts are placed in bags and then loaded onto pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, the usual production time is 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies based on the destination port.
3. Special requirements require further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used in
bridges and tunnels.
Q3: What can you offer us?
A: We provide suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our highly-regarded formwork products.
Q4: How long does it take to develop a brief design and quote after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, based on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.