Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands out for its incredible strength and durability, allowing for multiple reuses in various construction projects. Its design ensures easy assembly and erection, making it the ideal choice for projects requiring repetitive same-shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight for a loaded container typically ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. Packaging varies according to the product's specifications:
---Bundles: Timber beams, steel props, tie rods, etc.
---Pallet: Smaller components will be bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregularly shaped items will be loaded in bulk within the container.
Delivery:
1. Production: For a full container order, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery timeline depends on the destination port.
3. Special requirements can be accommodated through negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with our own 2 factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products used for
bridges and tunnels.
Q3: What can you do for us?
A: We provide our expertise through suggestions, formwork layout drawings, and quotations to owners, design institutes, or contractors of construction projects.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peer companies with superior formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days, based on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.