Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is known for its exceptional strength and durability, which allows it to be reused multiple times in various construction projects. Its design ensures ease of assembly and erection, making it incredibly suitable for constructing structures that require a substantial quantity of same-shaped components, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container typically ranges from 22 tons to 25 tons. This needs to be confirmed prior to loading.
2. We utilize different packaging methods tailored to specific products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then organized on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we usually require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time depends on the destination charge port.
3. Special requirements will be addressed through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with our own two factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products specifically for
bridges and tunnels.
Q3: What can your company do for us?
A: We provide expert suggestions, formwork layout drawings, and quotations for construction project owners, design institutes, and contractors.
B: Our products are available for purchase by contractors, building companies, material suppliers, and trading companies.
C: We support our global partners with our premium formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days to produce the products, based on their type and quantity.
Q6: What are your terms of payment?
A: We require a 30% T/T in advance, with the balance due before shipment.