Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork is engineered for resilience and longevity, making it perfect for multiple uses in construction projects. It offers straightforward assembly and erection, and its fixed shape and structure are ideal for large-scale projects with repetitive designs such as high rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed before loading.
2. Different products require different packaging methods:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are packaged in bags and placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within containers.
Delivery:
1. Production: For a full container, production typically requires 20-30 days after receiving the customer's down payment.
2. Transportation: Time depends on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We collaborate with global peer companies, offering them our superior formwork products.
Q4: How long does it take to make a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30 to 60 days, depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.