Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is built for strength and durability, ensuring maximum reuse in construction projects. Easy to assemble and erect, it maintains a fixed shape and structure, making it ideal for projects requiring large quantities of similarly shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Standard container load typically ranges between 22 to 25 tons. This needs confirmation prior to loading.
2. Packaging varies by product:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then palletized.
---Wooden Cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, production typically takes 20-30 days following receipt of the customer's down payment.
2. Transportation: Timeframes depend on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with our own two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: What services do you provide?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: Our products are sold to contractors, construction companies, material suppliers, and trading companies.
C: We supply our exceptional formwork products to worldwide peer companies.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific construction project requirements.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, manufacturing takes 30~60 days, depending on the product type and quantity.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.