Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
The Steel Formwork System is renowned for its unparalleled strength and durability, translating into multiple reuse opportunities in construction projects. Effortlessly assembled and erected, this system boasts a fixed shape and structure, making it the ideal choice for large-scale projects requiring uniform structural elements such as high-rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of a fully loaded container ranges between 22 tons to 25 tons, necessitating confirmation prior to loading.
2. Tailored packaging solutions for diverse products:
---Bundles: Ideal for items like timber beams, steel props, and tie rods.
---Pallet: Small parts are neatly packed in bags and placed on pallets for easy handling.
---Wooden cases: Available upon customer's request to ensure optimal protection.
---Bulk: Irregularly shaped goods are meticulously loaded in bulk within containers.
Delivery:
1. Production: For a full container, our typical production timeline is 20-30 days post receipt of the customer's down payment.
2. Transportation: Lead time varies based on the destination port's location and associated charges.
3. Special requirements warrant bespoke negotiation to cater to unique project needs.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a distinguished stencil making company with two state-of-the-art factories.
Q2: What services do you offer?
A: We specialize in the design and manufacture of high-quality formwork products tailored for
bridges and tunnels.
Q3: How can you support our projects?
A: Our expertise includes delivering suggestions, formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our top-tier products to contractors, building companies, material suppliers, and trading companies.
C: Our exceptional formwork products are highly sought after by our global peers.
Q4: How long does it take to provide a preliminary design and quotation after we submit the structural drawing?
A: Typically, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products post-contract signing?
A: Generally, the production timeline spans 30~60 days, influenced by the type and volume of products ordered.
Q6: What are your payment terms?
A: Our terms are 30% T/T in advance, with the remaining balance payable before shipment.