Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is synonymous with strength and durability, making it ideal for repeated use in construction. It's designed for easy assembly and erection, with a fixed shape and structure perfect for high-volume, same-shape projects like high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges between 22 tons and 25 tons. This must be confirmed before loading.
2. We use different packaging methods depending on the product:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller parts are placed in bags and then onto pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregularly shaped goods are loaded in bulk within containers.
Delivery:
1. Production: For a full container, we typically need 20-30 days after receiving the customer's down payment.
2. Transportation: Duration depends on the destination port charges.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with our own two factories.
Q2: What is your scope of work?
A: We specialize in designing and manufacturing formwork products specifically for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed drawings of formwork layouts, and competitive quotations for construction project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peer companies with our superior formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Typically, it requires
3
~7 days, depending on the specific needs of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days, depending on the type and quantity of products to be manufactured.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.