Basic Info.
Product Description
Steel Formwork System
Our steel formwork stands as a paragon of strength and durability, making it a perfect reusable asset for construction projects. Its assembly and erection are streamlined, thanks to its fixed shape and structure, making it ideal for high-volume, same-shaped structures like high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container ranges between 22 tons to 25 tons, a detail confirmed before loading.
2. We offer varied packaging solutions tailored to different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are secured in bags and then placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days post-receipt of the customer's down payment.
2. Transportation: Duration depends on the destination charge port.
3. Special requirements will be addressed through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company, boasting two dedicated factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used primarily for
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our products to contractors, construction companies, material suppliers, and trading firms.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to draft a design and provide a quotation once we submit the structural drawing?
A: Generally, it takes
3
to 7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products post-contract signing?
A: Typically, it takes 30 to 60 days, influenced by the type and quantity of products needed.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the remaining balance due before shipment.