Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our robust and long-lasting steel formwork is a game-changer in construction. Designed for repeated use, it is remarkably easy to assemble and erect. Its fixed shape and structure make it ideal for projects requiring large quantities of uniformly shaped components, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of the loaded container ranges from 22 tons to 25 tons. This needs to be confirmed prior to loading.
2. We use various packaging methods for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, our standard lead time is 20-30 days after receiving the down payment.
2. Transportation: The duration depends on the destination port charges.
3. Special requirements can be discussed and negotiated.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a specialized stencil-making company with two factories of our own.
Q2: What services do you provide?
A: We design and manufacture formwork products used primarily for
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our top-notch formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes us
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: We require a 30% T/T in advance, with the balance due before shipment.