Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Beijing Aoyu Template Co., Ltd. proudly presents the Steel Bridge Formwork System for Viaducts, a robust and highly durable solution designed for repeated use in various construction scenarios. This system is incredibly easy to assemble and erect, featuring a fixed shape and structure that makes it ideal for projects requiring large quantities of identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a fully loaded container ranges from 22 tons to 25 tons. This must be confirmed prior to loading.
2. Packaging varies based on the product type:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallets: Small parts are placed in bags before being set on pallets.
---Wooden Cases: Available upon customer's request for added protection.
---Bulk: Certain irregular goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment to complete the production.
2. Transportation: Duration depends on the destination charge port.
3. Special requirements will be addressed through negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company, equipped with our own two factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products specifically for
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert suggestions, comprehensive formwork layout drawings, and detailed quotations to project owners, design institutes, or contractors.
B: We supply our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We support our global peers with outstanding formwork products, enhancing their project outcomes.
Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Generally, it requires
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products once the contract is signed?
A: Typically, production takes 30~60 days based on the type and quantity of the products ordered.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.