Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is unmatched in strength and durability, making it ideal for repeated use in construction projects. This system is easily assembled and erected, thanks to its fixed shape and robust structure. It is perfectly suited for large-scale construction endeavors that require numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a fully loaded container ranges from 22 tons to 25 tons. This must be confirmed prior to loading.
2. We utilize different packaging methods for various products:
---Bundles: Items like timber beams, steel props, and tie rods are bundled.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies based on the destination port.
3. Special requirements must be discussed and negotiated.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What services do you provide?
A: We design and manufacture formwork products specifically for
bridge and tunnel construction.
Q3: How can you assist us?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations for construction project stakeholders, including owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We provide our exceptional formwork products to peer companies worldwide.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days, depending on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.