Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is engineered for strength and longevity, ensuring multiple reuses throughout construction projects. Its easy assembly and erection process make it an ideal choice for projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight for a loaded container typically ranges from 22 to 25 tons, to be confirmed before loading.
2. Packaging varies according to product type:
---Bundles: Used for items like timber beams, steel props, and tie rods.
---Pallets: Small parts are bagged and placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: Generally, it takes 20-30 days to complete a full container after receiving the customer's down payment.
2. Transportation: The delivery time depends on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products suitable for
bridges and tunnels.
Q3: How can you assist our projects?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We also support our international peers with our premium formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the project's specific requirements.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, based on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.