Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Experience unrivaled strength and durability with our Steel Formwork, designed for repeated use in construction. This system offers ease of assembly and erection. Its fixed shape and structure make it ideal for projects requiring large quantities of uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container ranges from 22 to 25 tons and must be confirmed before loading.
2. Tailored packaging solutions for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallets: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer request for added protection.
---Bulk: Irregular goods will be loaded in bulk inside the container.
Delivery:
1. Production: For a full container, we typically need 20-30 days post receipt of the customer's down payment.
2. Transportation: This depends on the destination charge port.
3. Special requirements may need additional negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, formwork layout drawings, and quotations to owners, design institutes, or construction project contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days based on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.