Basic Info.
Product Description
Steel Formwork System
Our steel formwork is engineered for strength and durability, ensuring it can be reused extensively in diverse construction projects. This system is designed for easy assembly and erection, offering a fixed shape and structured form that is ideal for high-rise buildings, roads, bridges, and any project requiring large quantities of uniformly shaped structures.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons. Confirmation is needed prior to loading.
2. Different packaging solutions are employed based on product types:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, the typical production time ranges from 20 to 30 days post receipt of the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products for
bridges and tunnels.
Q3: What services can you provide for us?
A: We offer expert suggestions, detailed formwork layout drawings, and comprehensive quotations to project owners, design institutes, and contractors.
B: Our products are sold to contractors, building companies, material suppliers, and trading companies.
C: We support peer companies worldwide with our top-notch formwork products.
Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, manufacturing takes between 30 to 60 days, depending on the type and quantity of the products.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.