• Customized Steel Formwork for Hardware Installation
  • Customized Steel Formwork for Hardware Installation
  • Customized Steel Formwork for Hardware Installation
  • Customized Steel Formwork for Hardware Installation
  • Customized Steel Formwork for Hardware Installation
  • Customized Steel Formwork for Hardware Installation

Customized Steel Formwork for Hardware Installation

After-sales Service: Yes
Warranty: One Year
Certification: ISO
Material: Steel
Type: Column Formwork
ODM or OEM: Yes
Customization:
Manufacturer/Factory
Diamond Member Since 2024

Suppliers with verified business licenses

Beijing, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (18)

Basic Info.

Model NO.
Column template
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Crafted for longevity and robustness, our steel formwork can be reused multiple times across various construction projects. Its seamless assembly and erection process, combined with its consistent shape and structure, make it ideal for constructions requiring repetitive structures such as high-rise buildings, roads, bridges, and more.
Customized Steel Formwork for Hardware Installation
Customized Steel Formwork for Hardware Installation
Customized Steel Formwork for Hardware Installation
Customized Steel Formwork for Hardware Installation
 

Packaging:

1. Typically, the loaded container's total net weight ranges between 22 tons and 25 tons, subject to confirmation before loading.
2. Various packaging methods are employed based on product type:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller components are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request for additional protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production generally takes 20-30 days post receipt of the customer's down payment.
2. Transportation: Timeframes vary depending on the destination charge port.
3. Special requirements are subject to negotiation.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a premier stencil making company, owning and operating two fully equipped factories.

Q2: What services do you provide?
A: We specialize in designing and manufacturing premium formwork products essential forinfrastructure such as bridges and tunnels.

Q3: How can we benefit from your services?
A: We provide expert recommendations, detailed formwork layout drawings, and competitive quotations to construction project stakeholders including owners, design institutes, and contractors.
B: Our products are available for purchase by contractors, construction firms, material suppliers, and trading companies.
C: We support our global peers by offering exceptional formwork products.

Q4: How long does it take to prepare a preliminary design and quotation once we provide the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific requirements of your construction project.

Q5: How much time is required to manufacture the products after the contract is signed?
A: Manufacturing duration ranges from 30 to 60 days, based on the type and quantity of products ordered.

Q6: What are your payment terms?
A: 30% T/T in advance, with the remaining balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Product Categories

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001