Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is synonymous with strength and durability, ensuring it can be reused multiple times across various construction projects. The easy assembly and erection process make it an ideal choice for projects requiring large quantities of identically shaped structures, such as high-rise buildings, roads, and bridges. The fixed shapes and structures streamline the construction process, providing unmatched efficiency.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which needs to be confirmed prior to loading.
2. We use different packaging methods tailored to each product:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically takes 20-30 days after receiving the customer's down payment.
2. Transportation: The duration is dependent on the destination port.
3. Special requirements: Negotiation is required for any special requests.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two self-owned factories.
Q2: What do you specialize in?
A: Our expertise lies in designing and manufacturing formwork products utilized for
bridges and tunnels.
Q3: What services can you provide for us?
A: We offer valuable suggestions, detailed drawings of formwork layouts, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, construction companies, material suppliers, and trading companies.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to draft a design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days based on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products once the contract is signed?
A: Typically, it takes 30-60 days, depending on the type and quantity of the products to be produced.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.