Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Adjustable Steel Formwork System is engineered to be exceptionally strong and durable, ensuring it can be reused numerous times throughout various construction projects. Easy to assemble and erect, this formwork is ideal for construction projects requiring a substantial quantity of identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container generally ranges from 22 to 25 tons and requires confirmation prior to loading.
2. We utilize different packaging methods for various products:
---Bundles: Suitable for items such as timber beams, steel props, and tie rods.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For full container orders, production typically takes 20-30 days after receipt of the customer's down payment.
2. Transportation: Delivery time depends on the destination charge port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products used in
bridge and tunnel construction.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for construction project stakeholders including owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: Our exceptional formwork products support peer companies worldwide.
Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days based on the product type and quantity required.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.