Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is incredibly robust and built to last, making it ideal for repeated use in construction projects. It boasts an easy assembly and erection process. With its fixed shape and structure, this formwork is perfect for projects requiring consistent, same-shaped structures like high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight for a fully loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We use different packaging methods for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: This is contingent upon the destination charge port.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil-making company with our own two factories.
Q2: What do you do?
A: We design and manufacture formwork products used for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and comprehensive quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days based on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: A 30% T/T advance payment is required, with the balance due before shipment.