Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is a powerhouse in construction, known for its unparalleled strength and durability. Reusable across multiple projects, this formwork is a dream to assemble and erect. Its fixed shape and robust structure make it the ultimate solution for constructing large quantities of identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container generally ranges between 22 to 25 tons. This needs confirmation before loading.
2. Tailored packaging solutions for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, and more.
---Pallet: Small parts are safely packed in bags and placed on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For full container orders, expect a lead time of 20-30 days post receiving the down payment.
2. Transportation: Timelines depend on the destination charge port.
3. Special requirements? Let's discuss and negotiate to meet your needs.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a dedicated stencil manufacturing company with two fully-owned factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products,
especially for bridges and tunnels.
Q3: How can you assist us?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations for owners, design institutes, or contractors involved in construction projects.
B: Our products are available for sale to contractors, building companies, material suppliers, and trading firms.
C: We proudly support our global peers with top-tier formwork products.
Q4: How long does it take to prepare a design and quotation after we provide the structural drawings?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture products after the contract is signed?
A: Generally, the manufacturing process takes 30~60 days based on the product type and quantity.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment with the balance due before shipment.