• Steel Formwork for Viaduct Construction Applications
  • Steel Formwork for Viaduct Construction Applications
  • Steel Formwork for Viaduct Construction Applications
  • Steel Formwork for Viaduct Construction Applications
  • Steel Formwork for Viaduct Construction Applications
  • Steel Formwork for Viaduct Construction Applications

Steel Formwork for Viaduct Construction Applications

After-sales Service: Yes
Warranty: One Year
Certification: ISO
Material: Steel
Type: Column Formwork
ODM or OEM: Yes
Customization:
Manufacturer/Factory
Diamond Member Since 2024

Suppliers with verified business licenses

Beijing, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (18)

Basic Info.

Model NO.
Column template
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Essential Information
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Detailed Product Overview

Advanced Steel Formwork System

Our steel formwork system is renowned for its strength and durability, making it an ideal choice for repeated use in various construction projects. Its ease of assembly and erection, coupled with its fixed shape and structure, makes it perfect for large-scale projects requiring uniform structures such as high-rise buildings, roads, and bridges.
Steel Formwork for Viaduct Construction Applications
Steel Formwork for Viaduct Construction Applications
Steel Formwork for Viaduct Construction Applications
Steel Formwork for Viaduct Construction Applications
 

Packaging Information:

1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be verified before loading.
2. We employ different packaging methods tailored to specific products:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery Details:
1. Production: For a full container, the production timeline is typically 20-30 days after the receipt of the customer's down payment.
2. Transportation: The duration depends on the destination port charges.
3. Special requirements will be negotiated as per customer's needs.

Frequently Asked Questions
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturing company with our own two factories, specializing in high-quality formwork solutions.

Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products forbridges and tunnels, ensuring precision and reliability.

Q3: How can we benefit from your services?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for project owners, design institutes, and construction contractors.
B: We sell our high-grade products to contractors, building companies, material suppliers, and trading firms.
C: We support global peer companies with our exceptional formwork products, ensuring high standards and reliability.

Q4: What is the timeline for creating a design and quotation after receiving structural drawings?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: What is the manufacturing timeline post-contract signing?
A: It typically takes 30~60 days to manufacture the products, contingent on the type and quantity required.

Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001