Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands out for its robust strength and exceptional durability, allowing it to be reused multiple times in diverse construction projects. With its straightforward assembly and erection process, it proves to be an ideal solution for high-volume, same-shape structure projects such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a fully loaded container ranges from 22 tons to 25 tons. This must be verified prior to loading.
2. We utilize various packaging methods tailored to different products:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller components are bagged and then placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk for optimal space utilization.
Delivery:
1. Production: For a full container load, we generally require 20-30 days after receipt of the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products used in
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We support our global peers with our top-tier formwork products.
Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after contract signing?
A: On average, it takes 30~60 days, depending on the type and quantity of the products ordered.
Q6: What are your payment terms?
A: Our terms are 30% T/T in advance with the balance due before shipment.