Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is built to last, providing unmatched strength and durability that allows it to be reused multiple times across various construction projects. Its easy assembly and erection, coupled with its fixed shape and structure, make it ideal for repetitive tasks in high-rise buildings, roads, bridges, and other large-scale constructions.
Packaging:
1. Typically, the total net weight for a loaded container ranges between 22 to 25 tons, which must be confirmed prior to loading.
2. Diverse packaging solutions for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts will be secured in bags and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For full container orders, production typically takes 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies based on the destination charge port.
3. Special requirements will require negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company, operating with our own two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used in
the construction of bridges and tunnels.
Q3: What services can you provide for us?
A: We offer comprehensive services including suggestions, formwork layout drawings, and quotations to owners, design institutes, and contractors involved in construction projects.
B: We sell our high-quality products to contractors, construction companies, material suppliers, and trading companies.
C: We extend our support to global peer companies by providing outstanding formwork products.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance paid before shipment.