Adjustable Steel Formwork for Viaduct Column Forming Needs

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Adjustable Steel Formwork for Viaduct Column Forming Needs
  • Adjustable Steel Formwork for Viaduct Column Forming Needs
  • Adjustable Steel Formwork for Viaduct Column Forming Needs
  • Adjustable Steel Formwork for Viaduct Column Forming Needs
  • Adjustable Steel Formwork for Viaduct Column Forming Needs
  • Adjustable Steel Formwork for Viaduct Column Forming Needs
Find Similar Products

Basic Info.

Model NO.
Column template
Certification
ISO
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork system is renowned for its exceptional strength and durability, allowing for extensive reuse in construction projects. The system is designed for easy assembly and erection, making it ideally suited for construction scenarios requiring a large volume of uniform structures, such as high-rise buildings, roads, and bridges.
Adjustable Steel Formwork for Viaduct Column Forming Needs
Adjustable Steel Formwork for Viaduct Column Forming Needs
Adjustable Steel Formwork for Viaduct Column Forming Needs
Adjustable Steel Formwork for Viaduct Column Forming Needs
 

Packaging:

1. Typically, the total net weight of a fully loaded container ranges from 22 tons to 25 tons. This must be confirmed prior to loading.
2. We use different packaging methods depending on the product type:
---Bundles: Suitable for items such as timber beams, steel props, and tie rods.
---Pallet: Small parts are placed into bags and then onto pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port's location.
3. For special requirements, negotiation is needed to finalize the details.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two of our own factories.

Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.

Q3: What can you do for us?
A: We offer expert suggestions, detailed formwork layout drawings, and precise quotations tailored to the needs of owners, design institutes, or contractors for various construction projects.
B: We sell our high-quality products to contractors, construction companies, material suppliers, and trading companies.
C: We provide our exceptional formwork products to peer companies worldwide, ensuring their projects benefit from our expertise.

Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: In general, it takes 30~60 days, depending on the type and quantity of products to be produced.

Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier