Steel Concrete Formwork System for Construction

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Steel Concrete Formwork System for Construction
  • Steel Concrete Formwork System for Construction
  • Steel Concrete Formwork System for Construction
  • Steel Concrete Formwork System for Construction
  • Steel Concrete Formwork System for Construction
  • Steel Concrete Formwork System for Construction
Find Similar Products

Basic Info.

Model NO.
Column template
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month

Product Description

Steel Formwork System

The Steel Concrete Formwork System by Beijing Aoyu Template Co., Ltd. is renowned for its strength and durability, allowing for multiple reuses in various construction projects. Its ease of assembly and erection, coupled with a fixed shape and structure, makes it ideal for projects requiring a high quantity of uniform structures, such as high-rise buildings, roads, bridges, and more.
Steel Concrete Formwork System for Construction
Steel Concrete Formwork System for Construction
Steel Concrete Formwork System for Construction
Steel Concrete Formwork System for Construction

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons. This must be confirmed prior to loading.
2. Packaging varies based on the product:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are placed in bags and then on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, standard production time is 20-30 days post receipt of customer’s down payment.
2. Transportation: Duration is contingent upon the destination port.
3. Special requirements can be negotiated.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with two own factories.

Q2: What do you do?
A: We specialize in designing and manufacturing formwork products for construction.Our products are commonly used for bridges and tunnels.

Q3: What can you do for us?
A: We provide suggestions, formwork layout drawings, and quotations to project owners, design institutes, or contractors.
B: We sell our products to contractors, building companies, material suppliers, or trading companies.
C: We support our international partners with top-notch formwork products.

Q4: How long does it take to provide a brief design and quotation after we submit the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific project requirements.

Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30-60 days, depending on the type and quantity of products ordered.

Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance to be paid before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier