Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is renowned for its strength and durability, allowing for multiple reuses in various construction projects. Its assembly and erection are straightforward, making it highly efficient. The fixed shape and robust structure make it ideal for repetitive construction requirements, such as those in high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a fully loaded container ranges between 22 to 25 tons, which must be confirmed prior to loading.
2. We utilize different packaging methods based on the product type:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallets: Smaller parts are bagged and then placed on pallets for secure transportation.
---Wooden Cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically requires 20-30 days from the receipt of the customer's down payment.
2. Transportation: The delivery timeline depends on the destination port's logistics.
3. Special requirements will be addressed through negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with our own two factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products used for
bridges and tunnels.
Q3: What services can you provide for us?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products directly to contractors, building companies, material suppliers, and trading firms.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to create a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
to 7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, production requires 30 to 60 days, depending on the product type and quantity.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.