Adjustable Steel Formwork for Viaduct Structural Columns

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Adjustable Steel Formwork for Viaduct Structural Columns
  • Adjustable Steel Formwork for Viaduct Structural Columns
  • Adjustable Steel Formwork for Viaduct Structural Columns
  • Adjustable Steel Formwork for Viaduct Structural Columns
  • Adjustable Steel Formwork for Viaduct Structural Columns
  • Adjustable Steel Formwork for Viaduct Structural Columns
Find Similar Products

Basic Info.

Model NO.
Column template
Certification
ISO
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our steel formwork system embodies unparalleled strength and durability, making it a prime choice for repeated use in construction projects. It is designed for effortless assembly and erection, with a fixed shape and structure, making it ideally suited for high-volume, same-shape applications such as high-rise buildings, roads, and bridges.
Adjustable Steel Formwork for Viaduct Structural Columns
Adjustable Steel Formwork for Viaduct Structural Columns
Adjustable Steel Formwork for Viaduct Structural Columns
Adjustable Steel Formwork for Viaduct Structural Columns
 

Packaging:

1. Generally, the total net weight of a loaded container ranges from 22 tons to 25 tons, a detail that must be confirmed before loading.
2. We use different packaging methods according to product types:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are placed in bags and then securely positioned on pallets.
---Wooden cases: Available upon customer's request for specific items.
---Bulk: Certain irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For full container orders, we typically require 20-30 days post receipt of customer's down payment for production.
2. Transportation: The duration is dependent on the destination port's location.
3. Special requirements may necessitate further negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company, complete with our own two factories.

Q2: What is your primary focus?
A: We specialize in designing and manufacturing formwork products utilized inthe construction of bridges and tunnels.

Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and detailed quotations to project owners, design institutes, and contractors.
B: Our products are available for purchase by contractors, building companies, material suppliers, and trading companies.
C: We support our global industry partners with our premium formwork products.

Q4: How long does it take to prepare a brief design and quotation once we provide the structural drawing?
A: Typically, it takes3
~7 days based on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days depending on the type and quantity of products needed.

Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier