Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system embodies unparalleled strength and durability, making it a prime choice for repeated use in construction projects. It is designed for effortless assembly and erection, with a fixed shape and structure, making it ideally suited for high-volume, same-shape applications such as high-rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 tons to 25 tons, a detail that must be confirmed before loading.
2. We use different packaging methods according to product types:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are placed in bags and then securely positioned on pallets.
---Wooden cases: Available upon customer's request for specific items.
---Bulk: Certain irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For full container orders, we typically require 20-30 days post receipt of customer's down payment for production.
2. Transportation: The duration is dependent on the destination port's location.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company, complete with our own two factories.
Q2: What is your primary focus?
A: We specialize in designing and manufacturing formwork products utilized in
the construction of bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and detailed quotations to project owners, design institutes, and contractors.
B: Our products are available for purchase by contractors, building companies, material suppliers, and trading companies.
C: We support our global industry partners with our premium formwork products.
Q4: How long does it take to prepare a brief design and quotation once we provide the structural drawing?
A: Typically, it takes
3
~7 days based on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days depending on the type and quantity of products needed.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.