Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is renowned for its strength and durability, which allows it to be reused multiple times in construction projects. It is designed for easy assembly and erection, making it highly efficient. Its fixed shape and structure are perfect for large-scale projects requiring uniform shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of a loaded container ranges between 22 to 25 tons, which needs to be confirmed prior to loading.
2. Different packages are employed for various products:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Certain irregular goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days following receipt of the customer's down payment.
2. Transportation: The time frame is dependent on the destination port.
3. Special requirements can be discussed and negotiated as needed.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two proprietary factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products primarily used for
bridge and tunnel constructions.
Q3: What can you do for us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We also supply outstanding formwork products to our global peer companies.
Q4: How long does it take to create a brief design and quotation once we provide the structural drawing?
A: Generally, it takes
3
~7 days based on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days depending on the type and quantity of products required.
Q6: What are your terms of payment?
A: Our terms are 30% T/T in advance, with the balance due before shipment.