Steel Formwork System for Building Construction

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Steel Formwork System for Building Construction
  • Steel Formwork System for Building Construction
  • Steel Formwork System for Building Construction
  • Steel Formwork System for Building Construction
  • Steel Formwork System for Building Construction
  • Steel Formwork System for Building Construction
Find Similar Products

Basic Info.

Model NO.
Column template
Certification
ISO
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork is renowned for its unparalleled strength and durability, allowing it to be reused multiple times in various construction projects. Designed for effortless assembly and erection, this formwork system maintains a fixed shape and structure, making it the perfect solution for construction projects requiring a high volume of identical-shaped structures, such as high-rise buildings, roads, and bridges.
Steel Formwork System for Building Construction
Steel Formwork System for Building Construction
Steel Formwork System for Building Construction
Steel Formwork System for Building Construction
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We offer different packaging options based on the product type:
---Bundles: Ideal for items like timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container order, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery times are dependent on the destination port's charges.
3. Special requirements may necessitate additional negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.

Q2: What do you specialize in?
A: We specialize in designing and manufacturing formwork products utilized inthe construction of bridges and tunnels.

Q3: How can you assist us?
A: We provide expert suggestions, detailed drawings of formwork layouts, and competitive quotations to project owners, design institutes, or contractors.
B: We sell our formwork products to contractors, construction companies, material suppliers, and trading companies.
C: We support our global peers with our high-quality formwork products.

Q4: How long does it take to create a preliminary design and quotation after we provide the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, contingent on the type and quantity of the products to be produced.

Q6: What are your payment terms?
A: We require a 30% T/T deposit in advance, with the balance payable before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier