Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is an epitome of strength and durability, making it ideal for multiple reuses in construction projects. Its ease of assembly and erection combined with a fixed shape and structure ensures it is highly suitable for high-volume, same-shaped structures such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container typically ranges from 22 to 25 tons, which must be confirmed before loading.
2. Different packaging materials are utilized for different products:
---Bundles: Includes items like timber beams, steel props, tie rods, etc.
---Pallets: Smaller parts are placed in bags and organized on pallets.
---Wooden cases: Available upon the customer's request.
---Bulk: Certain irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production Timeline: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: The timeframe depends on the destination charge port.
3. Special Requirements: Negotiation is necessary for any specialized needs.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two proprietary factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products specifically for
bridges and tunnels.
Q3: What services do you provide for us?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We extend our support to global peer companies by providing top-notch formwork products.
Q4: How long does it take to create a brief design and quotation once we provide the structural drawing?
A: Typically, it requires
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture products after contract signing?
A: Generally, it takes 30~60 days, based on the product type and quantity required.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.