Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Experience the strength and durability of our Steel Formwork System, designed for repeated use in construction projects. Effortless to assemble and erect, it holds a fixed shape and structure, making it ideal for projects requiring uniform shapes such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a loaded container ranges from 22 to 25 tons, requiring confirmation prior to loading.
2. Custom packaging solutions are provided for different products:
---Bundles: For items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are bagged before being placed on pallets.
---Wooden cases: Available upon customer request for additional protection.
---Bulk: Irregularly shaped items are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days post receipt of the customer's down payment.
2. Transportation: Duration varies based on the destination port.
3. Special requirements can be negotiated as needed.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a specialized stencil manufacturing company with two of our own factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, or contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to prepare a design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does manufacturing take after contract signing?
A: Typically, it takes 30~60 days, depending on the type and quantity of products ordered.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.