Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands out with its exceptional strength and durability, making it an ideal choice for multiple reuses in construction projects. Its design allows for effortless assembly and erection, providing a fixed shape and structure. This system is perfect for high-rise buildings, roads, bridges, and other projects requiring a large volume of identical structures.
Packaging:
1. Typically, the loaded container has a net weight between 22 to 25 tons. This needs to be confirmed prior to loading.
2. We use different packaging methods tailored to various products:
---Bundles: Timber beams, steel props, tie rods, etc.
---Pallets: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically takes 20-30 days after receiving the customer's down payment.
2. Transportation: The time required depends on the destination port.
3. Special requirements will be addressed through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: How can you assist us?
A: We provide suggestions, formwork layout drawings, and quotations to construction project owners, design institutes, or contractors.
B: Our products are sold to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers by supplying them with our premium formwork products.
Q4: How long does it take to create a brief design and quotation once we provide the structural drawing?
A: Generally, it takes around
3
~7 days, depending on the specific construction project requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, manufacturing takes 30~60 days, depending on the product type and quantity.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.