Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our robust Steel Formwork System is built for durability and strength, ensuring repeated use across diverse construction projects. Its easy assembly and fixed structure make it ideal for high-volume, same-shaped structures such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight for a fully loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. Various packaging methods are employed based on the product type:
---Bundles: Suitable for timber beams, steel props, tie rods, and other similar items.
---Pallet: Small parts are secured in bags and then placed on pallets.
---Wooden Cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within containers.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time is contingent on the destination's port charges.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you specialize in?
A: We design and manufacture premium formwork products utilized in
bridge and tunnel construction.
Q3: How can you assist us?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations to construction project owners, design institutes, and contractors.
B: Our products are sold to contractors, building companies, material suppliers, and trading firms.
C: We also offer exceptional formwork products to our global industry peers.
Q4: How long does it take to produce a preliminary design and quote after we submit the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after contract signing?
A: Generally, it takes 30~60 days, based on the type and quantity of products ordered.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment with the balance due before shipment.