Steel Formwork System for Viaduct Building Material

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Steel Formwork System for Viaduct Building Material
  • Steel Formwork System for Viaduct Building Material
  • Steel Formwork System for Viaduct Building Material
  • Steel Formwork System for Viaduct Building Material
  • Steel Formwork System for Viaduct Building Material
  • Steel Formwork System for Viaduct Building Material
Find Similar Products

Basic Info.

Model NO.
Column template
Certification
ISO
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month

Product Description

Steel Formwork System

The Steel Formwork System from Beijing Aoyu Template Co., Ltd. is a marvel of engineering, known for its robust and durable nature. This system can be reused numerous times, offering outstanding value for construction projects. Its assembly and erection are seamless, making it ideal for high-volume applications such as high-rise buildings, roads, and bridges where uniform structural shapes are necessary.
Steel Formwork System for Viaduct Building Material
Steel Formwork System for Viaduct Building Material
Steel Formwork System for Viaduct Building Material
Steel Formwork System for Viaduct Building Material

Packaging:

1. The total net weight of a loaded container generally ranges from 22 tons to 25 tons, and this must be confirmed before loading.
2. Tailored packaging ensures the integrity of various products:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are securely placed in bags and then organized on pallets.
---Wooden cases: Available upon customer's request for enhanced protection.
---Bulk: Irregularly shaped goods are efficiently loaded in bulk within the container.
Delivery:
1. Production: For a full container load, the manufacturing process typically takes 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery time varies depending on the destination port.
3. Special requirements: Negotiations are necessary to accommodate any unique needs.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two dedicated factories.

Q2: What are your main services?
A: We specialize in designing and manufacturing formwork products primarily utilized forbridges and tunnels, ensuring top-notch quality and reliability.

Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to construction project owners, design institutes, and contractors.
B: We supply our premium products to contractors, building companies, material suppliers, and trading companies.
C: Our exceptional formwork products are also available to peer companies worldwide.

Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific construction project requirements.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, the production timeline ranges from 30 to 60 days, contingent upon the type and quantity of the products ordered.

Q6: What are your payment terms?
A: Our payment terms are 30% T/T in advance, with the remaining balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier