Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is renowned for its exceptional strength and durability, allowing for multiple reuses in various construction projects. Its design ensures ease of assembly and erection, making it the ideal choice for large-scale construction requiring uniform structures. Perfect for high-rise buildings, roads, bridges, and other infrastructural developments.
Packaging:
1. Typically, our container loads range from 22 to 25 tons in net weight. Confirmation is required prior to loading.
2. We offer diverse packaging solutions tailored to different products:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Ideal for small parts, which are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request for additional protection.
---Bulk: Used for loading irregular goods directly into the container.
Delivery:
1. Production: For a full container, the usual production time is 20-30 days post receipt of the down payment.
2. Transportation: The duration depends on the specific destination charge port.
3. Special requirements may necessitate additional negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company, proudly operating two of our own factories.
Q2: What services do you provide?
A: We specialize in the design and production of formwork products essential for
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We extend our support globally, supplying peer companies with our superior formwork products.
Q4: How long does it take to provide a design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products post-contract signing?
A: Typically, manufacturing takes between 30 to 60 days, contingent on the product type and quantity.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.