Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is engineered for exceptional strength and durability, ensuring multiple reuses in diverse construction scenarios. It boasts an effortless assembly and erection process. With a fixed shape and robust structure, it is ideal for projects requiring numerous identical structural forms such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container typically ranges from 22 tons to 25 tons. This must be confirmed prior to loading.
2. Tailored packaging options are available for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular items are loaded in bulk into containers.
Delivery:
1. Production: For full container orders, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: This depends on the destination port and associated charges.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products tailored for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and quotations for construction project owners, design institutes, or contractors.
B: We sell our superior products to contractors, building companies, material suppliers, and trading firms.
C: We offer support to our global peers with our top-notch formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days, based on the type and quantity of products to be manufactured.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.