Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is robust, durable, and can be reused multiple times, making it a versatile choice for construction projects. Its easy assembly and erection, coupled with a fixed shape and structure, make it ideal for high-volume, same-shaped structures such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container ranges from 22 to 25 tons and must be confirmed before loading.
2. Packaging varies by product type:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk in the container.
Delivery:
1. Production: Typically, 20-30 days are needed for full container production post down payment.
2. Transportation: Dependent on the destination port.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: How can you assist us?
A: We provide suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We sell our products to contractors, construction companies, material suppliers, and trading companies.
C: We supply our exceptional formwork products to peer companies globally.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific project requirements.
Q5: What is the manufacturing timeline post-contract signing?
A: Typically, 30~60 days are required based on the type and quantity of the product.
Q6: What are your payment terms?
A: 30% T/T in advance, balance before shipment.