Essential Information
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our robust and durable Steel Formwork is designed for multiple reuses, making it a perfect solution for large-scale construction projects. It's not only easy to assemble and erect but also maintains a fixed shape and structure, ideal for high-volume, same-shaped constructions such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the loaded container's total net weight ranges from 22 tons to 25 tons, which must be confirmed before loading.
2. Diverse packaging options are tailored for varying products:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days post receipt of the down payment.
2. Transportation: This varies based on the destination charge port.
3. Special requirements necessitate negotiation.
Frequently Asked Questions (FAQ)
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with our own two factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products specifically for
bridges and tunnels.
Q3: How can you assist us?
A: We provide suggestions, formwork layout drawings, and quotations to construction project owners, design institutes, or contractors.
B: We sell our products to contractors, building companies, material suppliers, or trading companies.
C: We supply our excellent formwork products to peer companies worldwide.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.