Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system is a testament to strength and durability, designed for reuse across multiple construction projects. This system's user-friendly assembly and erection process, combined with its fixed shape and structure, make it ideal for projects requiring uniform, repetitive structures such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges between 22 to 25 tons. This needs to be verified before loading.
2. Diverse packaging solutions are tailored for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller components are packed in bags and then placed on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port's location.
3. Special requirements can be addressed through negotiation.
FAQ
Q1:Are you a trading company or a manufacturer?
A: We are a professional stencil making company with two of our own factories.
Q2:What services do you provide?
A: We specialize in designing and manufacturing formwork products essential for
bridge and tunnel construction.
Q3:How can you assist us?
A: We offer expert suggestions, detailed drawings of formwork layouts, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, or trading firms.
C: We also support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, based on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.