Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is engineered for strength and durability, ensuring it can be reused multiple times throughout a project. Easy to assemble and erect, this formwork is perfect for large-scale construction that requires uniform shapes, such as high-rise buildings, roads, and bridges. Its fixed shape and structure make it an ideal choice for repetitive construction tasks.
Packaging:
1. Typically, the net weight of a fully loaded container ranges from 22 to 25 tons. This needs to be confirmed before loading.
2. We use different packaging methods tailored to each product type:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallets: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, typical production time is 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies depending on the destination port.
3. Special requirements can be addressed through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company, operating with two dedicated factories.
Q2: What is your main business?
A: We specialize in the design and manufacture of formwork products primarily used for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: Our exceptional formwork products are also available to our peers worldwide.
Q4: How long does it take to prepare a preliminary design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the product type and quantity required.
Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.