Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its strength and durability, allowing for multiple reuses in construction projects. Its easy assembly and erection make it ideal for structures requiring uniform shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of the loaded container generally ranges from 22 to 25 tons, which needs confirmation before loading.
2. We utilize different packaging methods for various products:
---Bundles: For items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, the typical production time is 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port's charges.
3. Special requirements will require further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products used for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, formwork layout drawings, and competitive quotations to owners, design institutes, and construction project contractors.
B: We sell our premium products to contractors, construction companies, material suppliers, and trading companies.
C: We offer our top-tier formwork products to peer companies worldwide.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific construction project requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the product type and quantity.
Q6: What are your terms of payment?
A: A 30% T/T advance payment is required, with the balance due before shipment.