Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System boasts exceptional strength and durability, ensuring multiple reuses in construction projects. Its user-friendly assembly and erection process make it an ideal solution for projects requiring a large number of identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of loaded containers ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. We offer different packaging solutions tailored to various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are secured in bags before being placed on pallets.
---Wooden cases: Available upon customer's request for specific items.
---Bulk: Suitable for loading irregular goods directly into containers.
Delivery:
1. Production: For a full container load, production typically takes 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time depends on the destination charge port.
3. Special requirements may necessitate additional negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two factories of our own.
Q2: What is your line of business?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: What services can you offer us?
A: We provide expert suggestions, detailed drawings of formwork layouts, and competitive quotations to owners, design institutes, and contractors involved in construction projects.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peer companies with our high-quality formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Normally, it takes 30~60 days based on the type and quantity of products to be manufactured.
Q6: What are your terms of payment?
A: We require a 30% T/T in advance, with the balance due before shipment.